All work

Energy · European Union — Step Up campaign · 2025

Step Up: Energy Access, in Every Channel at Once

Energy access is a national conversation. It only becomes one if the campaign shows up everywhere people already are.

Step Up: Energy Access, in Every Channel at Once

5M

People reached

6 weeks

Campaign duration

5

Channels run in parallel: TVC, radio, digital, influencer, OOH

The challenge

The EU's Step Up campaign on energy access in Ethiopia needed to land with ordinary households, not only with sector audiences — in six weeks, across a country where the media diet shifts sharply between a TV in Addis, a radio in a regional town and a phone in a young person's hand.

The approach

  1. 01

    Assisted in the roll-out across every channel in parallel, so a household met the same message on TV, on radio, on their feed and on the street within the same week.

  2. 02

    Built the creative around recognisable people and everyday moments — work, food, a shop staying open — rather than around infrastructure imagery.

  3. 03

    Ran influencer activations alongside paid digital so the campaign carried in Amharic on the platforms young Ethiopians actually use.

  4. 04

    Placed OOH in key cities across the country to give the campaign physical presence beyond the screen.

What we produced

  • TVC broadcast placement
  • Radio adaptations
  • Digital and social campaign assets, including static and vertical formats
  • Influencer activations
  • Out-of-home placements in key cities across Ethiopia

The result

Six weeks, five channels, five million people. Energy access stopped being a sector topic and became a public one.

Energy

Running an energy access programme that needs public uptake? Let's talk.

10M reached in 12 months

Trusted by institutions

Addis Ababa · Tallinn

European Union
GIZ
AFD
AECID
African Union
COOPI
UNHRC
European Union
GIZ
AFD
AECID
African Union
COOPI
UNHRC